粗壮挺进邻居人妻,夜夜躁狠狠躁日日躁2022,久久综合九色综合欧洲98,免费又粗又硬进去好爽A片视频

Language:CHINESESENGLISH

Home > News > Control purposes tall buildings?
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://ompos.cn

Control purposes tall buildings?

Time:[2014-7-26]  Hits:5080

Control of high-rise building construction intentions?
Foshan multi-layered steel high-rise buildings, the height of the large, high-rise buildings constructed in order to ensure the necessary rigidity Foshan Steel respond layer between the maximum displacement and displacement to be controlled, the main intent of the following:
1, to ensure that the basic structure of the body in elastic stress state, to prevent cracks in the concrete wall studs, floor slab crack control number, width.
2, ensure the integrity of infill walls, walls, walls and other non-structural components, to prevent significant damage.
3, the regularity of the control plane configured to avoid the formation changes, adverse effects on the structure.
Copyright:佛山市勝邦鋼結(jié)構(gòu)有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號(hào)